Work

  1. Mural Stage One

    Work Begins: 7/22/2013

    These photos are spread over 3 days. The primer coats need lots of drying time.

    2 coats Primer


    2 coast Liquitex Gesso


    Chalk Lines for Grid
    ...
    Categories
    Work
  2. Mural Final Drafts In Color

    Color drafts approved 7/15/2013

    Main wall:


    Left wall:


    Right wall (chosen option):


    Left wall (unused ...
    Categories
    Work
  3. Mural Sketch Rough Drafts and Grids

    Sketch drafts approved 6/30/2013

    Main Wall:


    Left Wall:


    Right Wall:



    Color Scheme:
    ...
    Categories
    Work
  4. Mural Begins

    Project started: 6/22/2013

    Initial sketches:







    Client immediately requested a mermaid instead of a scuba ...
    Categories
    Work